01473 724578
Your Basket is empty
Orwell Model Railways Logo
Orwell Model Railways
Home » Products » Hornby » SR 0-6-0 'C24' Q1 Class
=== This product has been discontinued ===
SR 0-6-0

R3559

Hornby -
SR 0-6-0 'C24' Q1 Class

This item appears to not currently be in stock
RRP £124.99, was £93.00, NOW £83.70

Although the Southern Region’s requirement for an austerity 0-6-0 tender goods locomotive resulted from the Board and Operating Department reacting to the increase in freight and military traffic at the time of the Dunkirk evacuation in 1940, with one eye on electrification, cost savings on steam stock had been implemented since 1935. When Oliver Bulleid took over as Chief Mechanical Officer from Richard Maunsell in 1937, he inherited an ongoing order for twenty Q Class 0-6-0 locomotives, which proved less than satisfactory in service and were in no way suitable for the demands of wartime. The answer, for Bulleid and his team, was to start from scratch.

The result that emerged over the next eighteen months was the basic, brutally styled Q1 class, the ‘Charlie’ as they came to be known, a locomotive devoid of ancillary ‘furniture’ and
RRP £124.99, was £93.00, NOW £83.70

Although the Southern Region’s requirement for an austerity 0-6-0 tender goods locomotive resulted from the Board and Operating Department reacting to the increase in freight and military traffic at the time of the Dunkirk evacuation in 1940, with one eye on electrification, cost savings on steam stock had been implemented since 1935. When Oliver Bulleid took over as Chief Mechanical Officer from Richard Maunsell in 1937, he inherited an ongoing order for twenty Q Class 0-6-0 locomotives, which proved less than satisfactory in service and were in no way suitable for the demands of wartime. The answer, for Bulleid and his team, was to start from scratch.

The result that emerged over the next eighteen months was the basic, brutally styled Q1 class, the ‘Charlie’ as they came to be known, a locomotive devoid of ancillary ‘furniture’ and reduced to the very bare bones of locomotive design. It had the largest available boiler fitted, was more powerful than the ‘Q’ class and had a greater tractive effort, yet it was barely 1½ tons heavier. The distinctive cladding for the boiler was ‘Idaglass’, an early form of fibreglass, constructed over a square steel framework that gave rise to the square tin can look. Designed with free running in mind, essential given its mixed traffic capability, the locomotive performed almost as well running tender first as it did running forward, being capable of a maximum speed of 75mph in both directions.

Bulleid’s concern for his train operating crews meant that the cab area bucked the austerity trend, with the major controls for both the driver and fireman being kept separate as far as possible. The seats, unlike those of the Drummond T9, were upholstered, with a backrest and the rounded, oversized cab was matched by a full cab on the 3,700 gallon tender that prevented the worst excesses of the British weather affecting the crews when running tender first.

There were faults with the design; the lack of a running plate, the ill placed brass drainage key at the Fireman’s window, the under-sized tender side-entry filler and the draughty footplate flooring, but the most perturbing was the braking distance, which was almost double that of an S15 with the same train load.

Forty Q1 locomotives were built during 1942, in three lots, at Brighton and Ashford, but a further twenty locomotives planned in 1946 were never built. Haulage tests were passed with honours, setting new scheduling standards and the class was pressed into heavy war-time traffic across the Southern region, as well as at Feltham for the important cross-London freight traffic. Post-war, the class settled down to freight, engineers’ and empty stock workings, as well as some regular passenger turns. The first of the class, No.33028, was withdrawn in February 1963, with the final three being withdrawn in 1966. One member of the class, C1, was saved for preservation in the National Collection.

Locomotive C24 was built at Ashford and outshopped on June 26, 1942, entering traffic at Feltham. Renumbered to 33024 under British Railways, C24 was withdrawn from service from Three Bridges on August 25, 1963.

Maximum curve Hornby 2nd radius + / 438mm

DCC Ready - 8 Pin
Gauge - 00

Manufacturer : Hornby
SKU : R3559
EAN : 5055286642357
Orwell Model Railways Ltd
Registered Offices: Ipswich Model Railway Centre, 48-52 Tomline Road, Ipswich, IP3 8DB
Registration Number: 11052594 in England & Wales
Terms & Conditions | Privacy | Contact Us | Delivery Policy | Return Policy